Construction started on the Malaysian section on 22 November 2020 and on the Singaporean section on 22 January 2021. Ī joint operating company between Singapore's SMRT Corporation and Malaysia's Prasarana will be the operator of the link. However, the RTS Link is expected to replace this shuttle once it is completed. When built, the RTS Link will be the second rail link between the two countries after the KTM Intercity's Shuttle Tebrau, between JB Sentral and Woodlands Train Checkpoint. īoth stations will consist of co-located customs, immigration and quarantine facilities of both countries. It will consist of two stations, with the Malaysian terminus at Bukit Chagar station and the Singaporean terminus at Woodlands North station, which also interchanges with Singapore's Thomson–East Coast MRT line. The Johor Bahru–Singapore Rapid Transit System ( RTS) Link is an international cross-border rapid transit system that will connect Johor Bahru, Malaysia and Woodlands, Singapore, crossing the Strait of Johor.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |